Verified Pros

Find the Top 11 Office Fit-out Contractors in Tokyo, TYO

Tokyo permits take 3-6 weeks (fast). Reality: night work mandatory in CBD (7pm-7am only). Premium 40-50% for night operations. Top contractors book 4-6 months out. Debris disposal expensive and regulated.

Start your renovation project with confidence. Get accurate costs, compare verified pros, and manage your RFP—all in one place.

Tokyo: Fast Permits, Night Work Mandatory, Extreme Precision

Permits process quickly: 3-6 weeks. Real cost: night work mandatory in most CBD buildings (7pm-7am only)—adds 40-50% to labor costs. Quality contractors book 4-6 months out. Costs: ¥49-75/sqft (extreme). Debris disposal expensive—budget ¥8,000-15,000/sqm.

Tokyo specifics:

  • Marunouchi/Otemachi CBD: Night work only. Building management rules strict. Debris removal must occur during permitted hours (typically 10pm-5am). Logistics critical.
  • Shibuya/Roppongi Tech: Similar night restrictions. Smart building tech integration expected. Contractors must be tech-savvy.
  • Seismic Standards: Among world's strictest. All interior elements must meet earthquake codes. Engineering sign-off required.

Japanese precision culture means zero tolerance for errors. Space optimization extreme—every detail measured to mm. Smart building tech standard. Debris regulations strict—verify contractor has proper disposal licenses. Night work brutal but unavoidable in Grade-A buildings.

Project by Aoyama Nomura Design
Project by CBRE Project Management
Project by Cushman & Wakefield

Why Tokyo is Unique

Building permits process in 3-6 weeks (efficient). Real challenge: most CBD buildings allow construction 7pm-7am only—night work premiums 40-50%. Quality contractors book 4-6 months ahead for Marunouchi/Shibuya. Debris disposal heavily regulated and expensive. Extreme space optimization required (every sqm costly).

Understanding Commercial Fit-out Costs in Tokyo

Costs vary significantly based on finish level, building age, location, and scope of work. Here's what you can expect:

Basic Fit-out

¥54 - 79/sqft
Paint, carpet, ceiling tiles, minor electrical. Ideal for move-in ready spaces.

Premium

¥82 - 132+/sqft
Custom millwork, glass partitions, high-end finishes, advanced technology.

Factors That Affect Your Budget

  • Building Age: Older buildings may require electrical upgrades, asbestos abatement, or structural modifications
  • Permit Requirements: Tokyo permitting can add 4-8 weeks and $5,000-50,000+ depending on scope
  • MEP Complexity: HVAC, electrical, and plumbing changes significantly impact cost
  • Timeline Pressure: Accelerated schedules may require overtime and premium pricing

Soft Costs & Fees

  • Architectural Fees: 5-15% of construction costs
  • Engineering: Mechanical, Electrical, Plumbing (MEP) design
  • Permit & Impact Fees: City-specific municipal charges
  • Project Management: Optional oversight (3-5% of project)

Get Your Custom Tokyo Office Build-Out Quote Instantly

Unlock tailored pricing for your Tokyo office project based on real local costs. No email needed.

Loading calculator...

List of Office Fit-out Contractors in Tokyo

Browse 11 verified contractors serving Tokyo. Filter by specialty, service type, or project size to find your perfect match.

11 contractors
Aoyama Nomura Design project

Aoyama Nomura Design

✓ Verified
☆☆☆☆☆ (0)
5,000+ sqft
Luxury Design Artisan Finishes

Award-winning luxury interior design and architectural group based in Tokyo.

CBRE Project Management project
☆☆☆☆☆ (0)
5,000+ sqft Design & Build
Office - Corporate HQ Industrial Medical - Clinical

The global leader in commercial real estate and project delivery.

Cushman & Wakefield project

Cushman & Wakefield

✓ Verified
☆☆☆☆☆ (0)
5,000+ sqft Design & Build
Office - Corporate Industrial Retail - Storefront

Global real estate services firm delivering integrated project & development services.

Gensler Tokyo project

Gensler Tokyo

✓ Verified
☆☆☆☆☆ (0)
10,000+ sqft
Office - Corporate HQ Hospitality

World-leading design and strategy for Tokyo's most prestigious headquarters.

ITOKI project

ITOKI

✓ Verified
☆☆☆☆☆ (0)
1,000+ sqft
Office - General

Comprehensive Tokyo office renovation and strategy firm with a global reputation.

Klein Dytham architecture project
☆☆☆☆☆ (0)
500+ sqft
Office - Creative Retail - Showroom

Multi-disciplinary design practice known for iconic and boutique Tokyo office fit-outs.

Kokuyo project

Kokuyo

✓ Verified
☆☆☆☆☆ (0)
1,000+ sqft
Universal Design Total Solution

Total office solution provider in Tokyo, from furniture supply to full interior build.

Okamura project

Okamura

✓ Verified
☆☆☆☆☆ (0)
1,000+ sqft
Ergonomics Workplace Well-being

Leading Tokyo developer of ergonomic environments and functional office interiors.

Steven Leach Group project

Steven Leach Group

✓ Verified
☆☆☆☆☆ (0)
2,000+ sqft
Office - Corporate Medical - Clinical Hospitality

Established APAC presence delivering reliable, strategy-led Tokyo fit-outs.

Tanseisha project

Tanseisha

✓ Verified
☆☆☆☆☆ (0)
3,000+ sqft
Award-winning Design Production

Specialist Tokyo firm with 40+ years of award-winning turnkey fit-out excellence.

Unispace project

Unispace

✓ Verified
☆☆☆☆☆ (0)
2,000+ sqft Design & Build
Office - Creative Office - Tech

A global design firm with a unified methodology for seamless project delivery.

RFP Service

Get 3-5 Comparable Proposals in 2 Weeks

Finding the right contractor takes time. Our RFP service handles the entire process—we document your requirements, engage qualified Tokyo contractors, manage the bidding, and deliver proposals ready for comparison.

  • We capture your requirements professionally
  • We distribute to vetted Tokyo contractors
  • You receive structured proposals in 2 weeks
  • We help you evaluate and choose
Christina R.
Your Project Manager
Christina R.
Architect

Start Here

Tell us about your project. We'll call you to discuss how the RFP service works.

Free consultation • No obligation

The Tokyo Commercial Construction Process

Timeline Expectations

Commercial build-outs in Tokyo typically follow this timeline:

  • Planning & Design (4-8 weeks): Space planning, architectural drawings, engineering
  • Permitting (3-8 weeks): Building department review and approval
  • Construction (8-20 weeks): Varies by size and complexity
  • Final Inspections (1-2 weeks): Certificate of occupancy

A standard 5,000 sqft office build-out takes approximately 4-6 months from design to move-in.

Choosing the Right Contractor

When evaluating contractors for your Tokyo project, consider:

  • Licensing & Insurance: Verify active licenses and adequate coverage
  • Specialty Experience: Has the contractor completed similar projects?
  • References: Speak with recent clients about their experience
  • Project Size Fit: Match contractor capacity to your project scope
  • Communication Style: Ensure alignment on reporting and updates

Frequently Asked Questions

Common questions about commercial renovation in Tokyo.

What is the average cost of a commercial build-out in Tokyo?
Commercial build-out costs in Tokyo typically range from $40-300+ per square foot depending on finish level and complexity. Basic cosmetic renovations run $40-80/sqft, standard tenant improvements cost $80-150/sqft, and high-end executive spaces can exceed $200-300/sqft. Factors like building age, MEP requirements, and permitting complexity significantly impact final costs.
How long does a typical commercial renovation take?
A standard 5,000 sqft office build-out takes 4-6 months from design to move-in. This includes 4-8 weeks for design, 3-8 weeks for permitting, and 8-16 weeks for construction. Larger or more complex projects can take 6-12 months. Fast-track schedules are possible at additional cost.
Do I need permits for my project?
Most commercial renovations require building permits. Cosmetic-only work (paint, carpet) may be exempt, but any structural, electrical, plumbing, or HVAC modifications require permits. Your contractor should handle the permit process, but budget 3-8 weeks and $5,000-50,000+ depending on project scope.
What's included in your RFP service?
Our RFP service includes professional scope of work documentation, distribution to 3-5 pre-qualified contractors in Tokyo, bid comparison analysis, and a dedicated project manager to guide you through selection. Most clients receive competitive proposals within 2 weeks.
What's the difference between Design & Build vs. Build Only?
Design & Build contractors handle both architectural design and construction under one contract, offering streamlined communication and often faster timelines. Build Only contractors work from plans provided by your architect or designer, which can offer more design flexibility but requires additional coordination.