Verified Pros

Find the Top 14 Office Fit-out Contractors in Singapore, SG

Singapore BCA approvals take 2-4 weeks (efficient). SCDF fire approval adds 1-2 weeks. Top contractors book 2-3 months out. Green Mark certification increasingly mandatory (add consultant costs). Hoist booking expensive.

Start your renovation project with confidence. Get accurate costs, compare verified pros, and manage your RFP—all in one place.

Singapore: Fast Approvals, Green Mark Required, Hoist Costs

BCA approval fast: 2-4 weeks. SCDF adds 1-2 weeks for fire safety. Quality contractors book 2-3 months out. Costs: S$36-66/sqft. Green Mark certification expected by most multinational tenants—budget for consultant (S$15-30K).

Singapore realities:

  • CBD/Marina Bay: Hoist booking S$80-150/day (expensive vs regional peers). Building security protocols strict. Foreign worker permits impact scheduling.
  • One-North Tech: Less strict building management. Easier logistics. Tech companies concentrated here. Still expect Green Mark requirements.
  • Green Mark: Increasingly non-negotiable. Platinum/Gold standard expected by MNCs. Budget consultant fees and premium materials.

BCA and SCDF processes efficient vs global standards. Foreign worker dependency means levy costs (S$450-950/month/worker) impact pricing. Hoist costs high—factor into budget. Green building standards among Asia's strictest.

Project by CBRE Project Management
Project by Conexus Studio
Project by Cushman & Wakefield

Why Singapore is Unique

BCA building plan approval takes 2-4 weeks. SCDF fire safety approval adds 1-2 weeks. Quality contractors book 2-3 months ahead for CBD/Marina Bay work. Green Mark certification increasingly required by tenants. Hoist costs S$80-150/day. Foreign worker levies impact pricing.

Understanding Commercial Fit-out Costs in Singapore

Costs vary significantly based on finish level, building age, location, and scope of work. Here's what you can expect:

Basic Fit-out

S$40 - 65/sqft
Paint, carpet, ceiling tiles, minor electrical. Ideal for move-in ready spaces.

Premium

S$73 - 123+/sqft
Custom millwork, glass partitions, high-end finishes, advanced technology.

Factors That Affect Your Budget

  • Building Age: Older buildings may require electrical upgrades, asbestos abatement, or structural modifications
  • Permit Requirements: Singapore permitting can add 4-8 weeks and $5,000-50,000+ depending on scope
  • MEP Complexity: HVAC, electrical, and plumbing changes significantly impact cost
  • Timeline Pressure: Accelerated schedules may require overtime and premium pricing

Soft Costs & Fees

  • Architectural Fees: 5-15% of construction costs
  • Engineering: Mechanical, Electrical, Plumbing (MEP) design
  • Permit & Impact Fees: City-specific municipal charges
  • Project Management: Optional oversight (3-5% of project)

Get Your Custom Singapore Office Build-Out Quote Instantly

Unlock tailored pricing for your Singapore office project based on real local costs. No email needed.

Loading calculator...

List of Office Fit-out Contractors in Singapore

Browse 14 verified contractors serving Singapore. Filter by specialty, service type, or project size to find your perfect match.

14 contractors
CBRE Project Management project
☆☆☆☆☆ (0)
5,000+ sqft Design & Build
Office - Corporate HQ Industrial Medical - Clinical

The global leader in commercial real estate and project delivery.

Conexus Studio project

Conexus Studio

✓ Verified
☆☆☆☆☆ (0)
2,500+ sqft
Collaboration Spaces High-Growth Tech

Award-winning design-build firm specializing in collaborative offices for Singapore's tech sector.

Cushman & Wakefield project

Cushman & Wakefield

✓ Verified
☆☆☆☆☆ (0)
5,000+ sqft Design & Build
Office - Corporate Industrial Retail - Storefront

Global real estate services firm delivering integrated project & development services.

DB&B project

DB&B

✓ Verified
☆☆☆☆☆ (0)
5,000+ sqft
Large-scale Proj Client Satisfaction

Leading commercial interior firm delivering award-winning, large-scale projects in Singapore.

Greeen project

Greeen

✓ Verified
☆☆☆☆☆ (0)
1,000+ sqft
Hospitality

Emphasizing sustainability and in-house carpentry for high-quality Singapore office interiors.

M Moser Associates project

M Moser Associates

✓ Verified
☆☆☆☆☆ (0)
5,000+ sqft Design & Build
Office - Tech Office - Creative Office - Corporate

Specializing in workplace strategy and design-led construction for the world’s most innovative brands.

OfficeStac project

OfficeStac

✓ Verified
☆☆☆☆☆ (0)
500+ sqft
Office - General

Highly recommended Singapore renovation expert favored by MNCs and SMEs.

Traart Group project

Traart Group

✓ Verified
☆☆☆☆☆ (0)
2,000+ sqft
Space Optimization Color Flow

Specializing in corporate office design with a strong focus on space and color flow.

Unispace project

Unispace

✓ Verified
☆☆☆☆☆ (0)
2,000+ sqft Design & Build
Office - Creative Office - Tech

A global design firm with a unified methodology for seamless project delivery.

Vanguard Workspace project

Vanguard Workspace

✓ Verified
☆☆☆☆☆ (0)
1,000+ sqft
Industrial Style Rapid Build-out

Delivering industrial-style office environments with a focus on rapid implementation.

Woods Bagot project

Woods Bagot

✓ Verified
☆☆☆☆☆ (0)
5,000+ sqft
Global Benchmarks Strategic Design

Global design leaders providing high-performance office environments for Brisbane's top firms.

Yangs Design Associates project
☆☆☆☆☆ (0)
2,000+ sqft
Office - Corporate Industrial

Motivating and modern workspaces delivered with absolute precision.

Zoro Interior project

Zoro Interior

✓ Verified
☆☆☆☆☆ (0)
2,000+ sqft
Detail Management Quality Controls

Providing meticulous interior finishing and general contracting for offices in Singapore.

ADM Design and Build project
☆☆☆☆☆ (0)
1,000+ sqft
Modern Workspace Project Coordination

Specializing in corporate interior fit-outs and integrated furniture solutions in Singapore.

RFP Service

Get 3-5 Comparable Proposals in 2 Weeks

Finding the right contractor takes time. Our RFP service handles the entire process—we document your requirements, engage qualified Singapore contractors, manage the bidding, and deliver proposals ready for comparison.

  • We capture your requirements professionally
  • We distribute to vetted Singapore contractors
  • You receive structured proposals in 2 weeks
  • We help you evaluate and choose
Christina R.
Your Project Manager
Christina R.
Architect

Start Here

Tell us about your project. We'll call you to discuss how the RFP service works.

Free consultation • No obligation

The Singapore Commercial Construction Process

Timeline Expectations

Commercial build-outs in Singapore typically follow this timeline:

  • Planning & Design (4-8 weeks): Space planning, architectural drawings, engineering
  • Permitting (3-8 weeks): Building department review and approval
  • Construction (8-20 weeks): Varies by size and complexity
  • Final Inspections (1-2 weeks): Certificate of occupancy

A standard 5,000 sqft office build-out takes approximately 4-6 months from design to move-in.

Choosing the Right Contractor

When evaluating contractors for your Singapore project, consider:

  • Licensing & Insurance: Verify active licenses and adequate coverage
  • Specialty Experience: Has the contractor completed similar projects?
  • References: Speak with recent clients about their experience
  • Project Size Fit: Match contractor capacity to your project scope
  • Communication Style: Ensure alignment on reporting and updates

Frequently Asked Questions

Common questions about commercial renovation in Singapore.

What is the average cost of a commercial build-out in Singapore?
Commercial build-out costs in Singapore typically range from $40-300+ per square foot depending on finish level and complexity. Basic cosmetic renovations run $40-80/sqft, standard tenant improvements cost $80-150/sqft, and high-end executive spaces can exceed $200-300/sqft. Factors like building age, MEP requirements, and permitting complexity significantly impact final costs.
How long does a typical commercial renovation take?
A standard 5,000 sqft office build-out takes 4-6 months from design to move-in. This includes 4-8 weeks for design, 3-8 weeks for permitting, and 8-16 weeks for construction. Larger or more complex projects can take 6-12 months. Fast-track schedules are possible at additional cost.
Do I need permits for my project?
Most commercial renovations require building permits. Cosmetic-only work (paint, carpet) may be exempt, but any structural, electrical, plumbing, or HVAC modifications require permits. Your contractor should handle the permit process, but budget 3-8 weeks and $5,000-50,000+ depending on project scope.
What's included in your RFP service?
Our RFP service includes professional scope of work documentation, distribution to 3-5 pre-qualified contractors in Singapore, bid comparison analysis, and a dedicated project manager to guide you through selection. Most clients receive competitive proposals within 2 weeks.
What's the difference between Design & Build vs. Build Only?
Design & Build contractors handle both architectural design and construction under one contract, offering streamlined communication and often faster timelines. Build Only contractors work from plans provided by your architect or designer, which can offer more design flexibility but requires additional coordination.